The railroad bridge, weighing in at approximately 700 tons, was installed by the Rosslauer Schiffswerft on 01 December 2018. The highway BAB 8 had to be fully blocked off for parts of the work. The local newspaper Pforzheimer Zeitung documented the procedure in a video.
Read more