The SET shipyard in Genthin received an order from the water management office in Kempten with the branches in Freiburg, Tübingen and Kempten for the construction of three aluminum work boats with a length of around 15m and a width of 6m for the Bodensee.
It is driven by a hydraulic shovel drive and the collection and removal of driftwood and seaweed from the Bodensee is also hydraulic. The boats also have a construction crane. The ships should be handed over by April 2023 at the latest.