Summary of undertaken tasks:
Hull:
3450 sqm of underwater hull cleaned and corrosion protection applied
See chests cleaned and corrosion protection applied
Thruster canal cleaned and corrosion protection applied
Additional water canal cleaned, corrosion protection applied
1365 sqm above-water hull cleaned and corrosion protection applied
480 sqm deck area cleaned and corrosion protection applied
Bunkering deck and tanks for dredged material cleaned and corrosion protection applied
2300 sqm of main deck cleaned and corrosion protection applied
Superstructure:
Front deckhouse: outer surface cleaned, corrosion protection applied
Aft deckhouse and funnel: cleaned and corrosion protection applied
Dredging gear on deck:
Corrosion protection applied to side-suction pipes and cranes
Corrosion protection applied to side suction pipes and deposit blocks
Corrosion protection applied to dredging pipes and accessories