As already carried out on three Maersk vessels, the Rupertus Strako GmbH undertook a number of projects on the North Sea Floating Dredger.
Summary of undertaken tasks:
Hull:
3450 sqm of underwater hull cleaned and corrosion protection applied See chests cleaned and corrosion protection applied Thruster canal cleaned and corrosion protection applied Additional water canal cleaned, corrosion protection applied 1365 sqm above-water hull cleaned and corrosion protection applied 480 sqm deck area cleaned and corrosion protection applied Bunkering deck and tanks for dredged material cleaned and corrosion protection applied 2300 sqm of main deck cleaned and corrosion protection applied
Superstructure:
Front deckhouse: outer surface cleaned, corrosion protection applied Aft deckhouse and funnel: cleaned and corrosion protection applied
Dredging gear on deck:
Corrosion protection applied to side-suction pipes and cranes Corrosion protection applied to side suction pipes and deposit blocks Corrosion protection applied to dredging pipes and accessories